Português English Français
 

CONDURIL's works in Botswana

Label4

Construction of motorway between Gaborone and Tlokweng - Gaborone

Assignment Construction of motorway between Gaborone and Tlokweng
Localization Gaborone (Botswana)
Main characteristics Construction of a motorway between Gaborone and the South African border.

- Earthmoving: 184,000m3
- Bituminous: 350,000m2
- Construction of two bridges
- Drainage system
- Lighting
- Replacement of all existing infrastructures (Electricity/water networks/telecommunications)
Start/Finish 2008 / 2013
Participation 100%
Client Ministry of Public Works Roads Department
Know CONDURIL's
financial data
Discover our
Certified Central Laboratory
Check the distinctions
awarded to CONDURIL
Find out how CONDURIL
invest on Quality and Safetys