CONDURIL's works in Mozambique

Label18

Rehabilitation of irrigation channels - Chókwè

Assignment Rehabilitation of secondary channels and main drains at Chókwè
Localization Chókwè - Mozambique
Main characteristics Repair of channels, replacement and/or insertion of pipelines and sluices
Start/Finish 2002 / 2005
Participation 100%
Client Hidráulica do Chókwè
Label19

Dredge and cleanness of the Ribeira de Anguluzane - Xai-Xai

Assignment Dredge and cleanness of the Ribeira de Anguluzane, in the region of Xai-Xai
Localization Xai-Xai
Main characteristics Regularization of the Ribeira de Anguluzane, consisting of reprofiling of the transversal section and execution of agricultural roads
Start/Finish 2003/2004
Participation 100%
Client MOPH - ANE
Label20

Rehabilitation of road EN1(Lot 1) - Maxixe/ER520

Assignment Rehabilitation of road EN1 between Maxixe and road ER520 - ( Lot 1 )
Localization Maxixe
Main characteristics Repair and widening of the section Maxixe - Massinga, inserted in trunk road EN1, with a 70 km length, including work of mine clearance; earthworks; consolidation of ground by solo-cement execution; roadway with double surface coating; drainage and reinforcement and repair of bridges viaducts
Start/Finish May 2004 / July 2007
Participation 100%
Client MOPH - ANE
Label21

Construction of Tete Water Tratement Plant - Tete

Assignment Construction of Tete Water Tratement Plant
Localization City of Tete
Main characteristics The work consisted of the construction of a Water Treatment Plant for removing iron oxide and a tower with storage capacity for 128m3 of water. The tower was 30m high.

The Site Owner was DNA (National Water Department) and the work was financed by the Danish Embassy
Start/Finish 01/04/2005 to 28/02/2006
Participation 100%
Client Direcção Nacional de Águas
Label128

Maintenance of the R403 road, Catembe / Bela Vista (43 km), for three years

Assignment ANE – Delegação de Maputo
Localization Maputo
Main characteristics The project consists of the routine maintenance of the R403 road, Catembe-Bela Vista, for 3 years, including the following work: a) Soil base stabilised mechanically, DMT 15 km; b) Levelling, irrigation and compacting; c) Construction of aqueducts, including slabs made on-site, excavation and embankment; d) Opening of ditches, drains and aqueduct outlets; e) Road grading; f) Ground level excavation, levelling and compacting of the base using material removed from ditches and sides.

Start/Finish Apr 2007/Dec 2009
Participation 100%
Client
Label129

Construction of Lugela Bridge

Assignment Construction of Lugela Bridge
Localization Lugela
Main characteristics The project consists of the construction of a 270m (8 x 33.75) metre long bridge over the River Lugela and the respective access roads (1700m). The bridge has one lane in each direction and pavements on each side. The main activities of this project are:
1. Mine clearance
2. Access roads:
2.1. Ground levelling
2.2. Drainage, including the rehabilitation and extension of some existing box culverts
2.3. Double seal paving
3. Bridge:
3.1. Prestressed and reinforced concrete structures
3.2. Finishing
Start/Finish Oct 2005 / June 2008
Participation 100%
Client ANE
Label130

Construction of bridges on rural roads in Zambezia and Tete Provinces

Assignment Construction of bridges on rural roads in Zambezia and Tete Provinces
Localization Zambézia
Main characteristics The project consists of the construction of 3 bridges, namely:

1- Licungo III: A bridge 80.70m long and 5.00m high, with indirect foundations with driven piles (length between 12 and 15m, A=0.40 x 0.40m, 78 piles). The deck consists of four spans with four girders each, each girder weighing approximately 40 tonnes. Concrete = 940m³; Steel = 121 tonnes; Formwork: 867m² (mixed formwork) with the exception of the formwork for the prefabricated girders; Prestressed: Longitudinal with four strands per girder and transversal in the area of the cross girders and in the entire plate girder section.

2- Licungo II: A bridge 50.00m long and 5.00m high, with indirect foundations with drilled piles (length between 10 and 17m, D=2.00m, 3 piles). The deck consists of two spans with four girders each, each girder weighing approximately 47 tonnes. Concrete: Approx. = 403m³; Steel = 44 tonnes; Formwork: 445m² (mixed formwork) with the exception of the formwork for the prefabricated girders; Prestressed: Longitudinal with four strands per girder and transversal in the area of the cross girders and in the entire plate girder section.

3 - Cuacua I: A bridge 110.00m long and 8.50m high, with indirect foundations with driven piles (length between 14 and 17.5m, A=0.40 x 0.40m, 68 piles). The deck consists of five spans with three girders each, each girder weighing approximately 40 tonnes. Concrete = 965m³; Steel = 124 tonnes; Formwork: 1756m² (mixed formwork) with the exception of the formwork for the prefabricated girders; Prestressed: Longitudinal with four strands per girder and transversal in the area of the cross girders and in the entire plate girder section.
Start/Finish 2007 / 2010
Participation 100%
Client KONOKE
Label131

Rehabilitation on the bridges over the rivers Nhancuarara, Lucite and Mussapa

Assignment Rehabilitation on the bridges over the rivers Nhancuarara, Lucite and Mussapa
Localization Manica
Main characteristics The project consists of the construction of three bridges in Manica Province, with a total length of 440m and of the demolition of the old bridges. The River Nhancuarara will have a 60m long bridge resting on direct foundations. Its two pillars and abutments will have an average height of six metres. This construction work will require 1,500 m³ of reinforced concrete and 220 tonnes of steel. The Lucite Bridge will be 220m long, completely resting on direct foundations. Its ten pillars and abutments will have an average height of nine metres. This construction work will require 3,500m³ of reinforced concrete and 520 tonnes of steel. The Mussapa Bridge, 15 metres high and with a total length of 160m, has one of its abutments resting on direct foundations and the other, as with its seven pillars, on indirect foundations. The final structure will use 3,550m³ of reinforced concrete and 530 tonnes of steel. The decks, which will be similar on all of the bridges, with 20m spans between pillars, will rest on prefabricated girders and slabs, providing a 7.20m wide roadway.
Start/Finish 2008 / 2010
Participation 100%
Client ANE
Label132

Rehabilitation and construction of Avenida General Sebastião Marcos Mabote

Assignment Rehabilitation and construction of Avenida General Sebastião Marcos Mabote
Localization Maputo
Main characteristics The work consists of rehabilitation and construction on Avenida General Sebastião Marcos Mabote to a total length of 5.8km with a cross section of 16 metres consisting of two lanes in each direction. The rehabilitation and construction of this avenue includes the construction of ditches and other drainage structures, kerbs, pavements, increasing the current drainage capacity for possible flood situations, construction of box culverts to substitute the existing drifts, reconstruction of the base and sub-base layers of the road and laying of the wearing course, in stone blocks, construction of bus stops and taxi stands.
Start/Finish Oct 2007/Jan 2009
Participation 100%
Client Maputo City Municipal Council
Label133

Rehabilitation of infrastructures along the Limpopo railway line

Assignment Rehabilitation of infrastructures along the Limpopo railway line
Localization Maputo Province and Gaza Province
Main characteristics The project consists of the rehabilitation of the infrastructures along the Limpopo railway line, in particular the construction work on all of the station buildings in Manhiça, Magude, Chòkwé, Mabalane, Combomune, M´Púzi, Mapai and Chicualacuala and replacement of the water and electricity supply systems. The nature of the work presented is as described below, being a) Construction work: general repair of plaster on walls, cement screed on pavements, carpentry, metalwork, roofs and painting; b) Water supply: replacement of entire water supply system to the stations and to the resident population in the nearby areas via drinking fountains. Wells were rehabilitated and/or built for water abstraction; c) Energy: rehabilitation work was done on the entire electricity supply system to the stations and to the exterior, along the railway line, between the points. In the case of Mabalane, Combomune, M´Púzi, Mapai and Chicualacuala stations, generating units were installed to supply electricity.
The main obstacle to the implementation of the contract work was logistical, given the long distance over which the project extends. The distance between the furthermost stations, from a geographical point of view, Manhiça to Chicualacuala, is 520km.
Start/Finish Feb 2008 / Dec 2009
Participation 100%
Client CFM – Mozambique Railways
Label134

Emergency rehabilitation of Quelimane City drainage network

Assignment Emergency rehabilitation of Quelimane City drainage network
Localization Quelimane
Main characteristics The contract consists of the emergency rehabilitation of the drainage system in Quelimane City, Zambézia Province, within the established time limit of 160 days. The main activities to be carried out are: approx. 2,000m of PVC pipe laying, 645m of concrete pipe laying, 2,940.00m of kerbs as well as the construction of boxes and gutters and cleaning of the current network.
Start/Finish Jan / Sept 2008
Participation 100%
Client DNA – National Water Board
Label135

Rehabilitation and Construction on Rua Mário Coluna

Assignment Rehabilitation and Construction on Rua Mário Coluna
Localization Maputo
Main characteristics The work consists of rehabilitation and construction on Rua Dª Alice to a total length of 700m with a cross section of 7.5 metres consisting of one lane in each direction. The rehabilitation and construction of this avenue includes the construction of ditches, kerbs, pavements, the reconstruction of the base and sub-base of the road and the laying of the wearing course, in stone blocks, and the construction of bus stops and taxi stands.
Start/Finish Jan/Feb 2009
Participation 100%
Client Maputo City Municipal Council
Label136

Rehabilitation of Beira Sanitation

Assignment Rehabilitation of Beira Sanitation
Localization Beira
Main characteristics This contract awarded to the CMC-Conduril JV consortium is made up of four parts under the scope of the rehabilitation of the sewage and rainwater drainage network in Beira City within the contractual time limit of 30 months. Part 1 consists of the cleaning, CCTV inspection and non-intrusive renovation of the networks (€18,075,965.06); part 2 consists of the execution of the first phase of wastewater treatment (biological process wastewater treatment plant) through the formation of anaerobic ponds, optional and of maturation (€13,719,453.93); part 3 consists of the substitution of sanitation piping (€3,422,657.88) and part 4 consists of the rehabilitation of 4 pumping stations (EE), 11 pumping posts (PB) and the outlets to the sea (€7,234,836.71 ).
Start/Finish 2007 / 2012
Participation 100%
Client DNA – National Water Board
Label181

Rehabilitation 1,4 Km of Paquite Road

Assignment Rehabilitation 1,4 Km of Paquite Road
Localization City of Pemba, County of Pemba, Cabo Delgado Province
Main characteristics Rehabilitation of paved road with 1,4 km long with a platform 7 m wide .

Major works:
• Pipe Culverts – 241 lm (D1000 e 1200 mm)
• Concrete open drains – 1.200 lm
• Kerbing – 4.200 lm
• Crushed stone Sub-base and base – 1.680 m3
• Double seal – 10.290 m2
• Paving blocks sidewalks – 4.300 m2
Start/Finish August 2014 / March 2015
Participation 100%
Client ANADARKO
Label182

Construction of the new Maputo Fish Market

Assignment Construction of the new Maputo Fish Market
Localization Costa Do Sol - Maputo
Main characteristics The new fish market that rises along the coast consists of the following infrastructure:

• Retail Building, Building with 1620 m2 area of deployment whose final destiny will be the sale of fish and the provision of support areas. The final selling area will be composed of 100 benches.
• Garbage Storage, building with 61 m2 area of deployment. This is a building for solid waste management.
• Power Substation, building with 60 m2 area of deployment, to house the post processing.
• Water Tower, building with 16 m2 of construction area and 16 m high, whose fate will be putting a group of pump and water tank.
• Septic Tank, building with 56 m2 area of deployment for water treatment.
Start/Finish 2014 / 2015
Participation 100%
Client KONOIKE TOKURA JV
Label204

Reconstruction of Railway Bridges in Maputo, in line Ressano Garcia, Km 78 + 650

Assignment Reconstruction of Railway Bridges in Maputo, in line Ressano Garcia, Km 78 + 650
Localization Maputo
Main characteristics Replacement of a railway bridge in pre-ruin by a new one. The work consisted of the creation of new abutments and placement of a new board, metallic, with just one span with the old bridge in full operation, with only the necessary limiting speed of compositions for security reasons. New abutments were constructed in concrete, with indirect foundations. The whole procedure was performed within 4 months with a traffic stop at the end of imperatively 48 hours:
- Demolition of the old bridge and respective pillars;
- Concreting of the inside face of the new abutments;
- Application of prefabricated elements in structural elements of concrete;
- Installation of a new board on the new support equipment previously placed;
- Placement of a new route over the bridge and 10m on each side.

Main activities:
- Execution of 16 piles of concrete with 800mm diameter and 11m average depth;
- 270 m3 of concrete including the piles;
- 35 tons of steel applied, including piles;
- Construction of shipping and road transportation of the new board with 21m span and 40 tones after completion;
- Construction of shipping and road transportation and assembly of walkways and guardrails.
- Works on the route on a length of 40 m;
- Slope finishing work;
Start/Finish 2014 / 2014
Participation 100%
Client CFM
Label205

Renovation of Irrigation System of Xai Xai

Assignment Renovation of Irrigation System of Xai Xai
Localization Xai-Xai
Main characteristics Repair of channels, substitution and/or placement of sluices. Reprofiling of the cross-section.
Main activities:
Stripping, excavation and backfilling.
Start/Finish 2005 / 2008
Participation 100%
Client Ara - Sul