Português English Français
 

CONDURIL's works in Zâmbia

Label151

Nacala Road Corridor Project Phase II of Great East Road Nyimba to Sinda

Assignment Nacala Road Corridor Project Phase II of Great East Road Nyimba to Sinda
Localization Nyimba 400Km from Lusaka
Main characteristics The Works comprise the widening and strengthning of two sections of the T4 road between Nyimba and Sinda in the Eastern Province of Zambia. The two sections have a length of 114,78 Km. In-situ recycling/processing of a mixture of existing base, existing surfacing and imported material with cement. Construction of a 40mm Hot-mix Asphalt wearing course.
Other works:
- Construction of 2 new bridges each with 20.8 meters span
- Rehabilitation of one bridge with a span of 30 meters.
- Construction of road intersections, accesses, bus stops.
- Drainage
- Social programmes relating to HIV/AIDS, TB, etc..

Relevant amounts:
- Land clearing 175 Ha
- Excavation 280.000 m3
- Embankment 450.000 m3
- Asphalt 110.000 Ton
- Steel 658 ton
- Concrete 18.000 m3
Start/Finish 2013 - in progress
Participation 100%
Client Road Development Agency
Know CONDURIL's
financial data
Discover our
Certified Central Laboratory
Check the distinctions
awarded to CONDURIL
Find out how CONDURIL
invest on Quality and Safetys