IP - Modernisation of the Beira Alta Line, section Celorico da Beira - Guarda ( In consortium )
The contract refers to the modernisation of about 46 km of railway track over the current channel, integrating, namely, modernisation of the track superstructure - complete replacement of the track superstructure, alteration of the layout of Celorico da Beira, Pinhel, Vila Franca das Naves and Guarda stations in order to ensure the crossing of trains of 750 metres in length and optimisation of the operating conditions; Remodelling of stations and platforms, including raising, widening and extension of platforms, buildings and accessibilities; stabilisation of the track platform, stabilisation and occasional reinforcement of slopes; implementation of RCT+TP; adaptation of fixed electrical traction installations, when necessary; earth moving and drainage along the entire line; works of art - over and underpasses; services affected: EDP and PT; reconstruction/adaptation of buildings and technical rooms.
Rehabilitation of the international bridge over the Guadiana river
Full rehabilitation of the bridge and access viaduct, as follows: the rehabilitation of the existing infrastructure, including the cable-stayed system, reinforced concrete and final painting; replacement of pavement, signage, lighting and telematics; improvement/replacement of bearing supports and expansion joints; and installation of the instrumentation system.
Renovation of the system of surface runoff water collection channels of the old mining area of São Domingos: phase 2 - left bank.
Renovation of the side channels, construction and rehabilitation of culverts, protection structures in gabions, special protection structures and works of stabilisation and structuring reinforcement of the chimneys of Achada do Gamo.
Modernisation of the Beira Baixa railway line: Covilhã-Guarda section (in consortium)
Rehabilitation of the entire section regarding the railway track platform, overhead line, stations and stops; implementation of return traction current and protective grounding (RCT+TP); and rehabilitation of 6 metal bridges.
Stabilisation of slopes between Km35.520 and Km69.600 on the Beira Baixa railway line (in consortium)
Execution of works of ground clearing, excavation, demolition, soil nailing, application of shotcrete, reinforced concrete walls, draining, gabion walls in slopes along 34 Km.
Extension and improvement of 2x4 lanes on the A4 motorway in the Águas Santas-Ermesinde subsection and rehabilitation of the current Águas Santas tunnels (in consortium)
Extension and improvement of 2x4 lanes; structural rehabilitation of the existing tunnels; reformulation of half of the southern service station; reformulation of the road platform and sidewalks in an overpass; construction of an overpass and activation of another; deactivation and demolition of the current pedestrian overpass; construction of the extension of 3 underpasses; construction of retaining walls in gabions; and construction of the rainwater retention basin.
Extension of the mixing building - Continental Mabor
Extension of the existing building, including: a partial basement, a main ground floor nave + 2, a main southern area dedicated to storage and two main areas, one for silos and another for loading and unloading. This intervention represents a new gross external area of 7,309 m².
Rehabilitation, alterations and extension of the buildings on Travessa da Horta Návia
Extension of the existing set of buildings, which includes the main house and part of the old factory. Complete rehabilitation of the palace house and a more intrusive intervention with the construction of a new building in the old factory. The multifamily building will be comprised by 31 units, divided into 5 blocks.
Environmental restoration of the old mining areas of Castelejo, Formiga, Vale de Videira, Vales and Póvoa de Cervães
Removal of the debris deposits, construction of accesses to the water plane and fishing platforms, restoration of the water line, coverage sealing, installation of surface draining in the heaps, and reinforcement of the environmental monitoring system through the construction of a large diameter piezometer to control the water content.
EDP administration building
Construction of an office building divided in two floors. On the -1 floor, a technical section with technical rooms, offices, archive, sanitary facilities and computer room was built. On the ground floor, in addition to the technical section comprised by offices, reception desk, meeting room and sanitary facilities, there is a medical office.
EXPANSION OF PSA SINES CONTAINERS PARK
This project provides for the expansion of the container parking area of Terminal XXI-Sines, through the paving and infrastructure of a new platform (B). In general, the new platform B will consist of paved areas on top of the marine embankments. The parks will be equipped with all the facilities and infrastructure necessary for their operation, such as rainwater drainage, water supply and firefighting, lighting and energy supply and served by roads for vehicles and park equipment such as RTGs, Reach Stacker and Prime Movers. The new platform B, with an area of about 5.3ha, will consist of 8 parks for full containers, each with 6 lines and 30 “bays”, which represents a capacity of 180 “ground slots” (TEUs) per park.
Water pipeline between Ramalde and Galegos, and pumping station of Ramalde (in consortium)
Supply and installation of water pipelines with a 28 Km extension and civil engineering works, supply and assembly of equipment and electrical installations regarding the pumping station of Ramalde.
ETAR (wastewater treatment plant) of Sousa (in consortium)
Construction of an industrial and wastewater treatment station, including the activities of: earth movement, civil engineering, painting of units and buildings, metalworking, pipe network, exterior arrangements, paving, fencing, landscaping, electromechanical equipment, electrical installations, access path to the ETAR and exploration for a 24-month period.
Modernisation of the Beira Baixa railway line: Castelo Branco/Vale de Prazeres section (in consortium)
Rehabilitation and electrification of the railway line between Km94+183 and Km132+450, with interventions on the railway, stabilisation of slopes, reformulation of stations and stops, execution of reestablishments and engineering structures, and line electrification.
Bridge over the Arade river
Construction of a totally suspended cable-stayed bridge in reinforced concrete and respective access viaducts with 842 m in total. More than 20 years after its construction, CONDURIL performed the rehabilitation works of this bridge and on the bridge over the Boina stream, including the rehabilitation of the cable-stayed system of the bridge over the Arade river, replacing the pre-stressed cables.
National infrastructures of the new urban centre of Sumbe
Design and construction of water supply system and wastewater drainage system infrastructures for a housing complex with approximately 14,000 inhabitants, including a lift pipeline with 9.5 Km, a pumping station with a 3,000 m³ reservoir, an ETAR (wastewater treatment plant), 3 Km of roads, several car parks and a sports field.
Malongo bridge pier
Design/construction of the contract work for the replacement of the docks 1, 2 and 3 for CABGOC – CABINDA GULF OIL COMPANY, without interrupting the drilling and production operations of the company. The main works performed included stake driving, landfills, reinforced concrete, dredging, demolitions and all the service infrastructures (piping).
Provincial tax delegation of Lunda Norte and tax office of Saurimo
Construction of a 3-floor building in Lunda Norte and a 1-floor building in Saurimo, including the following works: earth movement, coating, construction of green areas, fencing, streets and car parks, assembly of technical specialities and furniture supply.
Rehabilitation of the bridge over the Kwanza river
Rehabilitation of a 350 m bridge, with intervention in the reinforcement of the existing footing and pillars, replacement of the destroyed pillars and arches, execution of the extension of the entire deck, painting, paving, signage and draining.
Monument to the founder of the nation:
Dr. Agostinho Neto -
Luanda
Execution of civil engineering works for the support structure of the monument, respective coating, lighting, paving, infrastructures, gardening, construction of 4 lakes, assembly of 8 cybernetic fountains and installation of urban equipment.
Municipal hospital of Porto Amboim, health offices in Pinda and on Km17, and two houses in Luanda
Total rehabilitation of the facilities of the municipal hospital of Porto Amboim, construction of 2 medical offices and construction of 2 houses to support the technicians of the World Bank Health Sector Project.
Bridges on N380
Construction of 3 bridges: Mapuede bridge: with a single 35 m span and two abutments supported by indirect foundations, which reach 12 m deep; Messalo I bridge: with 5 spans, 35 m each, where the substructure is supported by indirect foundations; Messalo III bridge: with 4 spans, 35 m each, where the substructure is supported by indirect foundations.
Irrigation system of Gandlaze (90 ha)
Execution of the water supply network, in a total extension of 4,000 m of water supply piping, 7,000 m of drainage ditches coated in reinforced concrete and 9,000 m uncoated drainage ditches, including the pumping station, electrical line, and assembly of the power transformer station.
Bridges between Ile and Cuamba
Construction of 8 bridges: 2 bridges with 35 m long and 9.5 m, with indirect foundations and “perforation” pile work; 2 bridges with 30 m long and 11 m high, with direct and indirect foundations; 3 bridges with 15 m long and 9 m high, with direct foundations; and, 1 bridge with 70 m long and 14 m high, with indirect foundations.
Rehabilitation of the sanitation system in Beira (in consortium)
Rehabilitation of the sewage and rainwater drainage system of Beira: lot 1: cleaning, CCTV inspection and non-intrusive renovation of the systems; lot 2: execution of the first phase of wastewater treatment; lot 3: replacement of sewerage pipelines; lot 4: rehabilitation of 4 pumping stations, 11 pumping and drainage stations to the sea.
Rehabilitation of EN1 Maxixe-ER520
Repair and extension of 70 Km of road, including the works of demining, earthworks, soil consolidation through soil-cement, paving with double-surface coating, draining, and reinforcement and repair of bridges and viaducts.
Motorway between Gaborone-Tlokweng-South Africa border
Construction of an 11.3 Km two-lane motorway, 10.8 Km of one lane and 10 Km of service roads, including earth movement, paving, 2 bridges, drainage network, lighting and relocation of every existing infrastructure.
Alcántara-Garrovillas section of the Madrid-Extremadura high-speed railway line (in consortium)
Construction of 6.3 Km of high-speed railway line, including the 996 m Almonte bridge, the 431 m viaducts of Cagancha and Villaluengo, and the 341 m viaduct of Santa Ana.
Water pipelines of high delta - Lots 1 and 2
Lot 1: construction and rehabilitation of hydraulic works in reinforced concrete: 1 gravity water reservoir of 8 Ronkh passages, a new complementary dam with flood gates, 3 square bridges with flood gates and a new water catchment work. Lot 2: execution of earthworks and rehabilitation of the water pipelines and hydraulic works in a total extension of 144 Km.
Road of the North-South corridor between Makuti-Chirundu
Extension and paving of the road section with an extension of 6.5 Km in mountain profile. This work is located in a protected area inside a wildlife reserve, between the places of Makuti and Chirundu.